MACAU UPDATE FROM THE (CONSTRUCTION) GROUND

10/28/08 11:07AM EDT
Our guys in Macau have put on their construction helmets and safety glasses. Some interesting observations as follows:

• LVS stopped construction on 2 of the 4 towers on Lots 5 and 6.
• Construction remains on the Sheraton and St. Regis towers. We continue to believe construction will pause on these 2 towers as well after they skin the building.
• Shrangi-La and Traders postponed indefinitely and immediately
• Construction of two Cirque theaters on Lots 5 and 6 have been cancelled. The Cirque production teams have been sent home. The Cirque du Soleil show at The Venetian remains intact.
• MPEL’s City of Dreams has moved to a 3 phase opening from a 2 phase opening. Surprisingly, the opening of Phase 1 has been moved up to March 2009. It is our understanding that Phase 1 will include the casino floor and Crown Tower

We’ve been predicting the construction delays on Lots 5 and 6 for some time but incrementally the news is probably a positive for LVS and the Macau market. Less Capex means more cash flow near term. Regarding MPEL, for the City of Dreams to begin generating cash flow sooner is also a positive.
© 2024 Hedgeye Risk Management, LLC. The information contained herein is the property of Hedgeye, which reserves all rights thereto. Redistribution of any part of this information is prohibited without the express written consent of Hedgeye. Hedgeye is not responsible for any errors in or omissions to this information, or for any consequences that may result from the use of this information.